歡迎訪問濟(jì)南立強(qiáng)模具有限公司!

當(dāng)前位置:首頁-新聞中心-公司新聞注塑模具廠家收模時(shí)常見問題解析

注塑模具廠家收模時(shí)常見問題解析

來源:http://www.snksk.com/ 日期:2022-07-26

注塑模具廠家在驗(yàn)收模具時(shí),要注意一些常見的問題,因此需要提前了解好,然后做好預(yù)防措施,這樣才能順利進(jìn)行下一步的工作,下面來解析下問題內(nèi)容吧。
Injection mold manufacturers should pay attention to some common problems when accepting molds, so they need to understand them in advance, and then take preventive measures, so as to smoothly carry out the next step of work. Let's analyze the content of the problem.
由于接受模具的過程中總是伴隨著一定的風(fēng)險(xiǎn),所以對于任何可以想象和可能出現(xiàn)的情況,我們都須提前進(jìn)行風(fēng)險(xiǎn)評估。應(yīng)放在模具的復(fù)雜性、備件的關(guān)鍵特性、零件后處理的質(zhì)量以及移動(dòng)模具過程中的任何可預(yù)見的意外事件上。
As there are always certain risks in the process of accepting molds, we must carry out risk assessment in advance for any conceivable and possible situation. The focus should be on the complexity of the mold, the key characteristics of the spare parts, the quality of the post-processing of the parts, and any foreseeable accidents in the process of moving the mold.
如果評估后發(fā)現(xiàn)風(fēng)險(xiǎn)因素較高,則需要在收貨前做好更詳細(xì)的搬家前準(zhǔn)備工作。收到貨后,應(yīng)盡量避免模具損壞的發(fā)生,導(dǎo)致停產(chǎn)停產(chǎn),對注塑生產(chǎn)企業(yè)經(jīng)營產(chǎn)生負(fù)面影響。
If the risk factors are found to be high after the assessment, more detailed preparations should be made before the goods are received. After receiving the goods, we should try our best to avoid mold damage, which will lead to shutdown and have a negative impact on the operation of injection molding production enterprises.
濟(jì)南注塑模具
濟(jì)南注塑模具廠家建議在觀察一組模具加工的運(yùn)行情況,包括檢查模腔狀況、周期時(shí)間、成型工藝條件,其中不可思議的四點(diǎn)就是評估價(jià)值。如果模具不工作,特別是模具長時(shí)間不用,在模具準(zhǔn)備好轉(zhuǎn)移之前,需要進(jìn)行試加工,評估模具的使用價(jià)值。
Jinan injection mold manufacturers suggest observing the operation of a group of mold processing, including checking the mold cavity condition, cycle time and molding process conditions, among which the incredible four points are the evaluation value. If the mold does not work, especially if the mold is not used for a long time, it is necessary to carry out trial processing and evaluate the use value of the mold before the mold is ready for transfer.
剩下的標(biāo)本可以盡可能多地知道,但不可能知道更多的細(xì)節(jié)。實(shí)際生產(chǎn)工藝條件可能未知,或者修改后的工藝參數(shù)可能未知。循環(huán)時(shí)間不能外推,特殊的輔助設(shè)備可能不會(huì)引起注意。
The remaining specimens can be known as much as possible, but it is impossible to know more details. The actual production process conditions may be unknown, or the modified process parameters may be unknown. The cycle time cannot be extrapolated, and special auxiliary equipment may not attract attention.
如果模具在加工一個(gè)零件時(shí)只使用模具中的部分型腔,而不是模具在全型腔注射時(shí)的運(yùn)行狀態(tài),那么發(fā)給客戶的各種數(shù)據(jù)的加工參數(shù)當(dāng)然是有問題的。賣方交付模具前,在注塑機(jī)上進(jìn)行滿腔注射狀態(tài)的試車,以檢查模具每件產(chǎn)品的質(zhì)量。
If the mold only uses part of the cavity in the mold when processing a part, rather than the running state of the mold when it is injected in the full cavity, the processing parameters of various data sent to the customer are certainly problematic. Before delivering the mold, the Seller shall conduct a full injection test on the injection molding machine to check the quality of each product of the mold.
注塑模具廠家收模時(shí)常見問題解析相關(guān)內(nèi)容就是這樣了,如果您對存在的問題不上心,那么就會(huì)影響到注塑產(chǎn)品的質(zhì)量,造成損失,更多信息獲取就來網(wǎng)站http://www.snksk.com咨詢吧。
This is the content related to the analysis of common problems when the injection mold manufacturer collects the mold. If you are not concerned about the existing problems, it will affect the quality of injection molding products and cause losses. For more information, please visit the website http://www.snksk.com Consult.

相關(guān)產(chǎn)品 / Related products

濟(jì)南立強(qiáng)模具有限公司

魯ICP備15002024號-2

網(wǎng)站地圖    TXT    XML